{"id":3316,"date":"2024-11-20T18:45:37","date_gmt":"2024-11-20T17:45:37","guid":{"rendered":"https:\/\/enyse.com\/?p=3316"},"modified":"2024-11-29T13:15:09","modified_gmt":"2024-11-29T12:15:09","slug":"inicio-del-corredor-de-henares","status":"publish","type":"post","link":"https:\/\/enyse.com\/gb\/phase-henares-corridor\/","title":{"rendered":"Another phase commissioned at the Henares corridor"},"content":{"rendered":"\n<p>The 3rd phase of the Atocha-Guadalajara line\u2019s Signalling upgrade was commissioned following the possession established by Adif between the 1 st and 7 th of November. This phase includes the sections of track between Coslada, O\u2019Donnell, Vic\u00e1lvaro Mercanc\u00edas and San Fernando de Henares, then carrying on to Torrej\u00f3n de Ardoz. The main works on the system included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>New EiS23 electronic interlocking at San Fernando, keeping the track side equipment with the exception of the replaced audio-frequency JTCs on the Coslada and O\u2019Donnell sides.<\/li>\n\n\n\n<li>New EiS23 electronic interlocking at Torrej\u00f3n, handling the four-track block with San Fernando.<\/li>\n\n\n\n<li>New EiS23 electronic interlocking at O\u2019Donnell, including the block relations with Hortaleza, San Fernando and Vic\u00e1lvaro Mercanc\u00edas, as well as with Vic\u00e1lvaro\u2019s inland dry port. Audio-frequency JTCs have been installed from this end to San Fernando and Vic\u00e1lvaro Mercanc\u00edas.<\/li>\n\n\n\n<li>Replacement of application SW at Coslada, allowing the telecom block with San Fernando and supplying new wayside signals and audio-frequency JTCs.<\/li>\n\n\n\n<li>Upgrade of the EiS23 interlocking at Vic\u00e1lvaro Mercanc\u00edas, allowing a new double-track, both senses block with O\u00b4Donnell, eliminating the existing parallel interfaces.<\/li>\n<\/ul>\n\n\n\n<p>Such works affected the lines detailed below, where<strong> <\/strong>both senses of circulation are now allowed. The tracks were returned after the possessions in due time and manner, without alterations to the train traffic \u2013 whether in the C1, C2, C7 or C8 commuter lines or the freight services.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Vic\u00e1lvaro to Torrej\u00f3n de Ardoz, lines L930 and L200<\/li>\n\n\n\n<li>Hortaleza to San Fernando de Henares, line L200<\/li>\n\n\n\n<li>O\u2019Donnell to Vic\u00e1lvaro-Mercanc\u00edas, line L940<\/li>\n\n\n\n<li>Vic\u00e1lvaro to Vic\u00e1lvaro-Mercanc\u00edas, line L944<\/li>\n\n\n\n<li>Vic\u00e1lvaro-Mercanc\u00edas to Vic\u00e1lvaro-Mercanc\u00edas junction, line L948<\/li>\n<\/ul>\n\n\n\n<p>Once again, from Enyse we want to thank the permanent availability and tremendous effort of the areas of Adif involving Project Management, Technical Assistance and Maintenance Department. The project goes on now towards Alcal\u00e1 de Henares all the way up to Guadalajara, where it will link with the contract for the Signalling upgrade between Guadalajara and Ariza.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The 3rd phase of the Atocha-Guadalajara line\u2019s Signalling upgrade was commissioned following the possession established by Adif between the 1 st and 7 th of November. This phase includes the sections of track between Coslada, O\u2019Donnell, Vic\u00e1lvaro Mercanc\u00edas and San Fernando de Henares, then carrying on to Torrej\u00f3n de Ardoz. The main works on the [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":3317,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3316","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sin-categoria"],"translation":{"provider":"WPGlobus","version":"3.0.2","language":"gb","enabled_languages":["es","gb"],"languages":{"es":{"title":true,"content":true,"excerpt":false},"gb":{"title":true,"content":true,"excerpt":false}}},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Another phase commissioned at the Henares corridor - Enyse<\/title>\n<meta name=\"description\" content=\"The 3 rd phase of the Atocha-Guadalajara line\u2019s Signalling upgrade was commissioned following the possession established by Adif\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Another phase commissioned at the Henares corridor - Enyse\" \/>\n<meta property=\"og:description\" content=\"The 3 rd phase of the Atocha-Guadalajara line\u2019s Signalling upgrade was commissioned following the possession established by Adif\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/\" \/>\n<meta property=\"og:site_name\" content=\"Enyse\" \/>\n<meta property=\"article:published_time\" content=\"2024-11-20T17:45:37+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-11-29T12:15:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/enyse.com\/wp-content\/uploads\/2024\/11\/coslada-noche.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"1200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Daniel Soto\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Daniel Soto\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/\"},\"author\":{\"name\":\"Daniel Soto\",\"@id\":\"https:\/\/enyse.com\/#\/schema\/person\/d00e47fd9b9edfef1ecb0705b7cf48f3\"},\"headline\":\"Another phase commissioned at the Henares corridor\",\"datePublished\":\"2024-11-20T17:45:37+00:00\",\"dateModified\":\"2024-11-29T12:15:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/\"},\"wordCount\":788,\"publisher\":{\"@id\":\"https:\/\/enyse.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/enyse.com\/wp-content\/uploads\/2024\/11\/coslada-noche.jpg\",\"articleSection\":[\"Sin categor\u00eda\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/\",\"url\":\"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/\",\"name\":\"Another phase commissioned at the Henares corridor - Enyse\",\"isPartOf\":{\"@id\":\"https:\/\/enyse.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/enyse.com\/wp-content\/uploads\/2024\/11\/coslada-noche.jpg\",\"datePublished\":\"2024-11-20T17:45:37+00:00\",\"dateModified\":\"2024-11-29T12:15:09+00:00\",\"description\":\"The 3 rd phase of the Atocha-Guadalajara line\u2019s Signalling upgrade was commissioned following the possession established by Adif\",\"breadcrumb\":{\"@id\":\"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/#primaryimage\",\"url\":\"https:\/\/enyse.com\/wp-content\/uploads\/2024\/11\/coslada-noche.jpg\",\"contentUrl\":\"https:\/\/enyse.com\/wp-content\/uploads\/2024\/11\/coslada-noche.jpg\",\"width\":1600,\"height\":1200},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"%frontpage%\",\"item\":\"https:\/\/enyse.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"En funcionamiento el inicio del corredor del Henares\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enyse.com\/#website\",\"url\":\"https:\/\/enyse.com\/\",\"name\":\"Enyse\",\"description\":\"Enyse is the heir of the longest history in Spain\u2019s Signalling sector \u2013 in 1924 the first electric interlocking is commissioned at Don Carlos station in Barcelona, which at the time was the head of the first railway line in Spain.\",\"publisher\":{\"@id\":\"https:\/\/enyse.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enyse.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enyse.com\/#organization\",\"name\":\"Enyse\",\"url\":\"https:\/\/enyse.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/enyse.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/enyse.com\/wp-content\/uploads\/2023\/10\/logo-enyse.png\",\"contentUrl\":\"https:\/\/enyse.com\/wp-content\/uploads\/2023\/10\/logo-enyse.png\",\"width\":250,\"height\":100,\"caption\":\"Enyse\"},\"image\":{\"@id\":\"https:\/\/enyse.com\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enyse.com\/#\/schema\/person\/d00e47fd9b9edfef1ecb0705b7cf48f3\",\"name\":\"Daniel Soto\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g\",\"caption\":\"Daniel Soto\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Another phase commissioned at the Henares corridor - Enyse","description":"The 3 rd phase of the Atocha-Guadalajara line\u2019s Signalling upgrade was commissioned following the possession established by Adif","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/","og_locale":"en_GB","og_type":"article","og_title":"Another phase commissioned at the Henares corridor - Enyse","og_description":"The 3 rd phase of the Atocha-Guadalajara line\u2019s Signalling upgrade was commissioned following the possession established by Adif","og_url":"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/","og_site_name":"Enyse","article_published_time":"2024-11-20T17:45:37+00:00","article_modified_time":"2024-11-29T12:15:09+00:00","og_image":[{"width":1600,"height":1200,"url":"https:\/\/enyse.com\/wp-content\/uploads\/2024\/11\/coslada-noche.jpg","type":"image\/jpeg"}],"author":"Daniel Soto","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Daniel Soto","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/#article","isPartOf":{"@id":"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/"},"author":{"name":"Daniel Soto","@id":"https:\/\/enyse.com\/#\/schema\/person\/d00e47fd9b9edfef1ecb0705b7cf48f3"},"headline":"Another phase commissioned at the Henares corridor","datePublished":"2024-11-20T17:45:37+00:00","dateModified":"2024-11-29T12:15:09+00:00","mainEntityOfPage":{"@id":"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/"},"wordCount":788,"publisher":{"@id":"https:\/\/enyse.com\/#organization"},"image":{"@id":"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/#primaryimage"},"thumbnailUrl":"https:\/\/enyse.com\/wp-content\/uploads\/2024\/11\/coslada-noche.jpg","articleSection":["Sin categor\u00eda"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/","url":"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/","name":"Another phase commissioned at the Henares corridor - Enyse","isPartOf":{"@id":"https:\/\/enyse.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/#primaryimage"},"image":{"@id":"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/#primaryimage"},"thumbnailUrl":"https:\/\/enyse.com\/wp-content\/uploads\/2024\/11\/coslada-noche.jpg","datePublished":"2024-11-20T17:45:37+00:00","dateModified":"2024-11-29T12:15:09+00:00","description":"The 3 rd phase of the Atocha-Guadalajara line\u2019s Signalling upgrade was commissioned following the possession established by Adif","breadcrumb":{"@id":"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enyse.com\/inicio-del-corredor-de-henares\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/#primaryimage","url":"https:\/\/enyse.com\/wp-content\/uploads\/2024\/11\/coslada-noche.jpg","contentUrl":"https:\/\/enyse.com\/wp-content\/uploads\/2024\/11\/coslada-noche.jpg","width":1600,"height":1200},{"@type":"BreadcrumbList","@id":"https:\/\/enyse.com\/inicio-del-corredor-de-henares\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"%frontpage%","item":"https:\/\/enyse.com\/"},{"@type":"ListItem","position":2,"name":"En funcionamiento el inicio del corredor del Henares"}]},{"@type":"WebSite","@id":"https:\/\/enyse.com\/#website","url":"https:\/\/enyse.com\/","name":"Enyse","description":"Enyse is the heir of the longest history in Spain\u2019s Signalling sector \u2013 in 1924 the first electric interlocking is commissioned at Don Carlos station in Barcelona, which at the time was the head of the first railway line in Spain.","publisher":{"@id":"https:\/\/enyse.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enyse.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/enyse.com\/#organization","name":"Enyse","url":"https:\/\/enyse.com\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/enyse.com\/#\/schema\/logo\/image\/","url":"https:\/\/enyse.com\/wp-content\/uploads\/2023\/10\/logo-enyse.png","contentUrl":"https:\/\/enyse.com\/wp-content\/uploads\/2023\/10\/logo-enyse.png","width":250,"height":100,"caption":"Enyse"},"image":{"@id":"https:\/\/enyse.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enyse.com\/#\/schema\/person\/d00e47fd9b9edfef1ecb0705b7cf48f3","name":"Daniel Soto","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g","caption":"Daniel Soto"}}]}},"_links":{"self":[{"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/posts\/3316","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/comments?post=3316"}],"version-history":[{"count":10,"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/posts\/3316\/revisions"}],"predecessor-version":[{"id":3353,"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/posts\/3316\/revisions\/3353"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/media\/3317"}],"wp:attachment":[{"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/media?parent=3316"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/categories?post=3316"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/tags?post=3316"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}