{"id":5080,"date":"2025-07-24T17:16:03","date_gmt":"2025-07-24T15:16:03","guid":{"rendered":"https:\/\/enyse.com\/?p=5080"},"modified":"2025-07-24T18:27:29","modified_gmt":"2025-07-24T16:27:29","slug":"puesta-en-servicio-reinosa-barcena","status":"publish","type":"post","link":"https:\/\/enyse.com\/gb\/commissioning-reinosa-barcena\/","title":{"rendered":"Commissioning Reinosa \u2013 Barcena"},"content":{"rendered":"\n<p>During a scheduled four-day shutdown, from June 12<sup>th<\/sup>&nbsp;to 16<sup>th<\/sup>, <strong>Enyse has completed the renovation of the signaling and communications systems on the Sope\u00f1a \u2013 Cobejo<\/strong> section. Specifically, Sope\u00f1a\u2019s interlocking was modified to enable the new block with the new Reinosa interlocking. In addition, the Lantueno, Pesquera, Montabliz and Cobejo interlocks were commissioned.<\/p>\n\n\n\n<p>In Cobejo station, a connection was established with the existing block controller with B\u00e1rcena. <strong>LED signals have been installed along the entire section<\/strong>. Regarding the detection systems, audio-frequency track circuits have been installed in the main line and the axle counters have been installed on switching areas and the siding tracks.<\/p>\n\n\n\n<p>This route is integrated into the conventional Palencia \u2013 Santander line and is another one that joins the work already completed to replace the <strong>Mataporquera, Pozazal, and Sope\u00f1a interlockings<\/strong>, with a total of <strong>53 kilometers of updated facilities.<\/strong><\/p>\n\n\n\n<p>These works include the adaptation of the facilities to the Santander CRC systems, which manages the Mataporquera \u2013 Santander route, integrating the Santander \u2013 Reinosa commuter rail section and providing <strong>access to the Raos Port from Muriedas station.<\/strong><\/p>\n\n\n\n<p>These works contribute to achieving the <strong>Sustainable Development<\/strong> Goals which has among its goals, the development of <strong>reliable, sustainable, resilient and quality infrastructures<\/strong>.<\/p>\n\n\n\n<p>Once again, Enyse would like to express its gratitude for the efforts and ongoing cooperation of Adif\u2019s areas of Operations, <strong>Operational Risks and Maintenance Department of the RC North line.<\/strong><\/p>\n\n\n\n<img decoding=\"async\" src=\"https:\/\/enyse.com\/wp-content\/uploads\/2025\/07\/operadores.jpg\" alt=\"Operadores\" width=\"100%\" \/>\n","protected":false},"excerpt":{"rendered":"<p>During a scheduled four-day shutdown, from June 12th&nbsp;to 16th, Enyse has completed the renovation of the signaling and communications systems on the Sope\u00f1a \u2013 Cobejo section. Specifically, Sope\u00f1a\u2019s interlocking was modified to enable the new block with the new Reinosa interlocking. In addition, the Lantueno, Pesquera, Montabliz and Cobejo interlocks were commissioned. In Cobejo station, [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":5081,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-5080","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sin-categoria"],"translation":{"provider":"WPGlobus","version":"3.0.2","language":"gb","enabled_languages":["es","gb"],"languages":{"es":{"title":true,"content":true,"excerpt":false},"gb":{"title":true,"content":true,"excerpt":false}}},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Commissioning Reinosa \u2013 Barcena - Enyse<\/title>\n<meta name=\"description\" content=\"Enyse has completed the renovation of the signaling and communications systems on the Sope\u00f1a \u2013 Cobejo section\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Commissioning Reinosa \u2013 Barcena - Enyse\" \/>\n<meta property=\"og:description\" content=\"Enyse has completed the renovation of the signaling and communications systems on the Sope\u00f1a \u2013 Cobejo section\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/\" \/>\n<meta property=\"og:site_name\" content=\"Enyse\" \/>\n<meta property=\"article:published_time\" content=\"2025-07-24T15:16:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-24T16:27:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/enyse.com\/wp-content\/uploads\/2025\/07\/portada-gestion-ferroviaria.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Daniel Soto\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Daniel Soto\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/\"},\"author\":{\"name\":\"Daniel Soto\",\"@id\":\"https:\/\/enyse.com\/#\/schema\/person\/d00e47fd9b9edfef1ecb0705b7cf48f3\"},\"headline\":\"Commissioning Reinosa \u2013 Barcena\",\"datePublished\":\"2025-07-24T15:16:03+00:00\",\"dateModified\":\"2025-07-24T16:27:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/\"},\"wordCount\":516,\"publisher\":{\"@id\":\"https:\/\/enyse.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/enyse.com\/wp-content\/uploads\/2025\/07\/portada-gestion-ferroviaria.jpg\",\"articleSection\":[\"Sin categor\u00eda\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/\",\"url\":\"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/\",\"name\":\"Commissioning Reinosa \u2013 Barcena - Enyse\",\"isPartOf\":{\"@id\":\"https:\/\/enyse.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/enyse.com\/wp-content\/uploads\/2025\/07\/portada-gestion-ferroviaria.jpg\",\"datePublished\":\"2025-07-24T15:16:03+00:00\",\"dateModified\":\"2025-07-24T16:27:29+00:00\",\"description\":\"Enyse has completed the renovation of the signaling and communications systems on the Sope\u00f1a \u2013 Cobejo section\",\"breadcrumb\":{\"@id\":\"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/#primaryimage\",\"url\":\"https:\/\/enyse.com\/wp-content\/uploads\/2025\/07\/portada-gestion-ferroviaria.jpg\",\"contentUrl\":\"https:\/\/enyse.com\/wp-content\/uploads\/2025\/07\/portada-gestion-ferroviaria.jpg\",\"width\":1024,\"height\":576,\"caption\":\"Hacia una gesti\u00f3n ferroviaria m\u00e1s sostenible y segura\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"%frontpage%\",\"item\":\"https:\/\/enyse.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Puesta en Servicio Reinosa &#8211; Barcena\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enyse.com\/#website\",\"url\":\"https:\/\/enyse.com\/\",\"name\":\"Enyse\",\"description\":\"Enyse is the heir of the longest history in Spain\u2019s Signalling sector \u2013 in 1924 the first electric interlocking is commissioned at Don Carlos station in Barcelona, which at the time was the head of the first railway line in Spain.\",\"publisher\":{\"@id\":\"https:\/\/enyse.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enyse.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enyse.com\/#organization\",\"name\":\"Enyse\",\"url\":\"https:\/\/enyse.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/enyse.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/enyse.com\/wp-content\/uploads\/2023\/10\/logo-enyse.png\",\"contentUrl\":\"https:\/\/enyse.com\/wp-content\/uploads\/2023\/10\/logo-enyse.png\",\"width\":250,\"height\":100,\"caption\":\"Enyse\"},\"image\":{\"@id\":\"https:\/\/enyse.com\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enyse.com\/#\/schema\/person\/d00e47fd9b9edfef1ecb0705b7cf48f3\",\"name\":\"Daniel Soto\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g\",\"caption\":\"Daniel Soto\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Commissioning Reinosa \u2013 Barcena - Enyse","description":"Enyse has completed the renovation of the signaling and communications systems on the Sope\u00f1a \u2013 Cobejo section","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/","og_locale":"en_GB","og_type":"article","og_title":"Commissioning Reinosa \u2013 Barcena - Enyse","og_description":"Enyse has completed the renovation of the signaling and communications systems on the Sope\u00f1a \u2013 Cobejo section","og_url":"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/","og_site_name":"Enyse","article_published_time":"2025-07-24T15:16:03+00:00","article_modified_time":"2025-07-24T16:27:29+00:00","og_image":[{"width":1024,"height":576,"url":"https:\/\/enyse.com\/wp-content\/uploads\/2025\/07\/portada-gestion-ferroviaria.jpg","type":"image\/jpeg"}],"author":"Daniel Soto","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Daniel Soto","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/#article","isPartOf":{"@id":"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/"},"author":{"name":"Daniel Soto","@id":"https:\/\/enyse.com\/#\/schema\/person\/d00e47fd9b9edfef1ecb0705b7cf48f3"},"headline":"Commissioning Reinosa \u2013 Barcena","datePublished":"2025-07-24T15:16:03+00:00","dateModified":"2025-07-24T16:27:29+00:00","mainEntityOfPage":{"@id":"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/"},"wordCount":516,"publisher":{"@id":"https:\/\/enyse.com\/#organization"},"image":{"@id":"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/#primaryimage"},"thumbnailUrl":"https:\/\/enyse.com\/wp-content\/uploads\/2025\/07\/portada-gestion-ferroviaria.jpg","articleSection":["Sin categor\u00eda"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/","url":"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/","name":"Commissioning Reinosa \u2013 Barcena - Enyse","isPartOf":{"@id":"https:\/\/enyse.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/#primaryimage"},"image":{"@id":"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/#primaryimage"},"thumbnailUrl":"https:\/\/enyse.com\/wp-content\/uploads\/2025\/07\/portada-gestion-ferroviaria.jpg","datePublished":"2025-07-24T15:16:03+00:00","dateModified":"2025-07-24T16:27:29+00:00","description":"Enyse has completed the renovation of the signaling and communications systems on the Sope\u00f1a \u2013 Cobejo section","breadcrumb":{"@id":"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/#primaryimage","url":"https:\/\/enyse.com\/wp-content\/uploads\/2025\/07\/portada-gestion-ferroviaria.jpg","contentUrl":"https:\/\/enyse.com\/wp-content\/uploads\/2025\/07\/portada-gestion-ferroviaria.jpg","width":1024,"height":576,"caption":"Hacia una gesti\u00f3n ferroviaria m\u00e1s sostenible y segura"},{"@type":"BreadcrumbList","@id":"https:\/\/enyse.com\/puesta-en-servicio-reinosa-barcena\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"%frontpage%","item":"https:\/\/enyse.com\/"},{"@type":"ListItem","position":2,"name":"Puesta en Servicio Reinosa &#8211; Barcena"}]},{"@type":"WebSite","@id":"https:\/\/enyse.com\/#website","url":"https:\/\/enyse.com\/","name":"Enyse","description":"Enyse is the heir of the longest history in Spain\u2019s Signalling sector \u2013 in 1924 the first electric interlocking is commissioned at Don Carlos station in Barcelona, which at the time was the head of the first railway line in Spain.","publisher":{"@id":"https:\/\/enyse.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enyse.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/enyse.com\/#organization","name":"Enyse","url":"https:\/\/enyse.com\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/enyse.com\/#\/schema\/logo\/image\/","url":"https:\/\/enyse.com\/wp-content\/uploads\/2023\/10\/logo-enyse.png","contentUrl":"https:\/\/enyse.com\/wp-content\/uploads\/2023\/10\/logo-enyse.png","width":250,"height":100,"caption":"Enyse"},"image":{"@id":"https:\/\/enyse.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enyse.com\/#\/schema\/person\/d00e47fd9b9edfef1ecb0705b7cf48f3","name":"Daniel Soto","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g","caption":"Daniel Soto"}}]}},"_links":{"self":[{"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/posts\/5080","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/comments?post=5080"}],"version-history":[{"count":15,"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/posts\/5080\/revisions"}],"predecessor-version":[{"id":5101,"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/posts\/5080\/revisions\/5101"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/media\/5081"}],"wp:attachment":[{"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/media?parent=5080"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/categories?post=5080"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enyse.com\/gb\/wp-json\/wp\/v2\/tags?post=5080"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}